plan [2019/03/08 12:41] – [Project Plan] team3plan [2019/04/23 11:21] (current) – [Project Plan] team3
Line 8: Line 8:
   * 2019-03-22 Upload the detailed **System Schematics & Structural Drawings** to the wiki and do the **cardboard scale model** of the structure   * 2019-03-22 Upload the detailed **System Schematics & Structural Drawings** to the wiki and do the **cardboard scale model** of the structure
   * 2019-03-27 Upload the **List of Materials (what & quantity)** to the wiki   * 2019-03-27 Upload the **List of Materials (what & quantity)** to the wiki
-  * 2019-04-06 Upload the **Interim Report and Presentation** to the wiki. The report must contain the the following chapters: Introduction, Project Management, State of the Art, Marketing Plan, Project Management, Eco-eficiency Measures for Sustainability, Ethical and Deontological Concerns, Proposed Solution and Bibliography. The Project Management chapter includes the updated project progress register, the sprint report for completed sprints (tasks that were included, statuses, assignees, allocations) and the updated release Gantt chart +  * 2019-04-06 Upload the **Interim Report and Presentation** to the wiki. The report must contain the the following chapters: Introduction, Project Management, State of the Art, Marketing Plan, Eco-efficiency Measures for Sustainability, Ethical and Deontological Concerns, Proposed Solution and Bibliography. In particular, the Project Management chapter includes the updated project progress register, the sprint report for completed sprints (tasks that were included, statuses, assignees, allocations) and the updated release Gantt chart 
   * 2019-04-11 Interim Presentation, Discussion and Peer, Teacher and Supervisor Feedbacks   * 2019-04-11 Interim Presentation, Discussion and Peer, Teacher and Supervisor Feedbacks
   * 2019-04-23 Complete the **List of Materials (local providers & price, including VAT and transportation)** to the wiki   * 2019-04-23 Complete the **List of Materials (local providers & price, including VAT and transportation)** to the wiki
Line 39: Line 39:
 | 3         | 21.03.2019     | 27.03.2019 | | 3         | 21.03.2019     | 27.03.2019 |
 | 4         | 28.03.2019     | 03.04.2019 | | 4         | 28.03.2019     | 03.04.2019 |
-| 5         | 04.04.2019     10.04.2019 |   +| 5         | 04.04.2019     12.04.2019 |      
-| 6         11.04.2019     23.04.2019 | +| 6         22.04.2019     30.04.2019 | 
-| 7         | 24.04.2019     | 30.04.2019 | +| 7         | 02.05.2019     | 15.05.2019 | 
-| 8         | 02.05.2019     | 15.05.2019 | +        | 16.05.2019     | 22.05.2019 | 
-        | 16.05.2019     | 22.05.2019 | +9         | 23.05.2019     | 29.05.2019 | 
-10        | 23.05.2019     | 29.05.2019 | +10        | 30.05.2019     | 05.06.2019 | 
-11        | 30.05.2019     | 05.06.2019 | +11        | 06.06.2019     | 12.06.2019 | 
-12        | 06.06.2019     | 12.06.2019 | +12        | 13.06.2019     | 19.06.2019 | 
-13        | 13.06.2019     | 19.06.2019 | +13        | 20.06.2019     | 26.06.2019 |
-14        | 20.06.2019     | 26.06.2019 |+
 </WRAP> </WRAP>
 </table> </table>
Line 60: Line 59:
 <WRAP box 400px center> <WRAP box 400px center>
 ^ PBI       ^ Reaserch and Organization         ^ Status     ^ ^ PBI       ^ Reaserch and Organization         ^ Status     ^
-        | Sprint Plan   | To do      |    +        | Sprint Plan   | To do      |    
-        | Gantt Chart    | To do      |       +        | Gantt Chart    | To do      |       
-        | Technical Research, Literature Review     | To do      |    +        | Technical Research, Literature Review     | To do      |    
-        | Market Research, Existing products    | To do      |    +        | Market Research, Existing products    | To do      |    
-        | Business Plan   | To do      |  +        | Business Plan   | To do      |  
 ^ PBI       ^ System Design        ^ Status      ^ PBI       ^ System Design        ^ Status     
 | E         | Draft & Blackbox   | To do      |    | E         | Draft & Blackbox   | To do      |   
-        | Material/Resource analysis/Selection  | To do      |      +        | Material/Resource analysis/Selection  | To do      |      
-        | Initial Budget Planning   | To do      |  +        | Initial Budget Planning   | To do      |  
 ^ PBI       ^ Interim      ^ Status      ^ PBI       ^ Interim      ^ Status     
-        | Presentation   | To do      |    +        | Presentation   | To do      |    
-        | Report   | To do      |     +        | Report   | To do      |     
 ^ PBI       ^ Detailed Design         ^ Status      ^ PBI       ^ Detailed Design         ^ Status     
-        | Design Developement  | To do      |    +        | Design Developement  | To do      |    
-        | Solidworks    | To do      |      +        | Solidworks    | To do      |      
-        | Construction Hardware   | To do      | +        | Construction Hardware   | To do      | 
-        | Construction Software   | To do      |    +        | Construction Software   | To do      |    
-        | Material buying  | To do      |      +        | Material buying  | To do      |      
-        | Assembly   | To do      |+        | Assembly   | To do      |
 ^ PBI       ^ Testing        ^ Status      ^ PBI       ^ Testing        ^ Status     
-        | Process Testing   | To do      |    +        | Process Testing   | To do      |    
-        | Functional Tests  | To do      |      +        | Functional Tests  | To do      |      
-        | Design change implimentation    | To do      |+        | Design change implimentation    | To do      |
 ^ PBI       ^ Final        ^ Status      ^ PBI       ^ Final        ^ Status     
-        | Report   | To do      |    +        | Report   | To do      |    
-        | Video   | To do      |      +        | Video   | To do      |      
-        | Poster  | To do      | +        | Poster  | To do      | 
-        | Presentation   | To do      | +        | Presentation   | To do      | 
-        | Manual   | To do      |+        | Manual   | To do      |
 </WRAP> </WRAP>
 </table> </table>
Line 97: Line 96:
 <table tlabel3> <table tlabel3>
 <caption>Sprint Plan</caption> <caption>Sprint Plan</caption>
-<WRAP box 400px center> +<WRAP box 500px center> 
-^ Sprint    ^ Task   Duration (d) ^  Responsible ^ Involved   + 
-| 1         | Sprint Plan | 1            | Julia      | team |   +^ Sprint    ^ Task                                     Responsible ^  Involved  ^ Status 
-| 2         | Gantt Chart  | 3             Z            X, Y, Z, W |     +| 1         | Sprint Plan                              | 1           | Julia      | team  |   
-| 3         | Technical Research, Literature Review    | 1             W, Y and Z   XY, Z, W +| 2         | Gantt Chart                              | 3           Julien         |     
-| 4         | Market Research      | 1             Y            XY, Z, W +| 3         | Technical Research, Literature Review    | 1           Julien     Ronald,Alex 
-| 5         | Existing products     | 2             Z and W      X, Y, Z, W |   +| 4         | Market Research                          | 1           Eren       Maike,Julia 
-| 6         | Business Plan     | 4             X and W      X, Y, Z, W +| 5         | Existing products                        | 2           Ronald     Julien|   
-| 7         | Draft & Blackblox (inititial idea’s)     | 2             Y and Z      X, Y, Z, W +| 6         | Business Plan                            | 4           Alex       Julia 
-| 8         | Material/ Resource analysis/ selection    | 4             X and W      X, Y, Z, W +| 7         | Draft & Blackblox (inititial idea’s)     | 2           Alex       Julien
-| 9         | Initial Budget Planning    | 2             Y and Z      X, Y, Z, W +| 8         | Material/ Resource analysis/ selection   | 4           Ronald     team  
-| 12        | Presentation    | 4             X and W      X, Y, Z, W +| 9         | Initial Budget Planning                  | 2           Julia      Maike 
-| 13        | Report     | 2             Y and Z      X, Y, Z, W +| 12        | Presentation                             | 4           Julia      team        
-| 14        | Design Developement   | 4             X and W      X, Y, Z, W +| 13        | Report                                   | 2           Maike      Alex        
-| 1         | Solidworks designing | 1            Julia      team |   +| 14        | Design Developement                      | 4           Julien     Alex        
-| 2         | Construct Hardware  | 3             Z            X, Y, Z, W |     +| 1         | Solidworks designing                     | 1           Alex       -           |   
-| 3         | Develope Software   | 1             W, Y and Z   X, Y, Z, W +| 2         | Construct Hardware                       | 3           Ronald     Eren        |     
-| 4         | Material buying     | 1             Y            X, Y, Z, W +| 3         | Develope Software                        | 1           Eren       Ronald      
-| 5         | Assembly   | 2             Z and W      | X, Y, Z, W |   +| 4         | Material buying                          | 1           Maike      team        
-| 6         | Process Testing    | 4             X and W      X, Y, Z, W +| 5         | Assembly                                 | 2           | Ronald     Julien        
-| 7         | Functional Tests     | 2             Y and Z      X, Y, Z, W +| 6         | Process Testing                          | 4           Julien     team        
-| 8         | Design change implementation    | 4             X and W      X, Y, Z, W +| 7         | Functional Tests                         | 2           Eren       team        
-| 9         | Report    | 2             Y and Z      X, Y, Z, W +| 8         | Design change implementation             | 4           Eren       team        
-| 12        | Video   | 4             X and W      X, Y, Z, W +| 9         | Report                                   | 2           Eren       team        
-| 13        | Poster    | 2             Y and Z      X, Y, Z, W +| 12        | Video                                    | 4           Maike      team        
-| 12        | Presentation  | 4             X and W      X, Y, Z, W +| 13        | Poster                                   | 2           Maike      Alex        
-| 13        | Manual   | 2             Y and Z      X, Y, Z, W |+| 12        | Presentation                             | 4           Julia      team        
 +| 13        | Manual                                   | 2           Alex       team        |
  
 </WRAP> </WRAP>